AI Energy & Data Centre Infrastructure

Power and cooling for racks that draw ten times what the hall was built for

The electrical and thermal engineering under AI compute: rack density, distribution, liquid cooling, grid connection and the energy economics.

  • Retrofit and new-build
  • Air, rear-door and liquid
  • Grid, generation and PPA
  1. 01 Rack 40–130 kW, where 5–10 kW was the norm
  2. 02 Heat rejection Air to 30 kW, then rear-door or cold plate
  3. 03 Distribution and UPS Busway, 3-phase PDUs, step-load headroom
  4. 04 Site and climate Power price and cooling hours dominate cost
  5. 05 Grid connection Queue position, measured in years not months
The rack sits at the top of the design, but the grid connection at the bottom sets the date.

Second constraint

You solve the GPUs, then you meet the power

We work from the grid connection inwards: what the site can import, how the distribution carries it and how the heat leaves the building. The output states the constraints — kW per rack, redundancy tier, and where the hall stops scaling.

  • Power envelope fixed before the hardware specification
  • Retrofits assessed honestly, including the ones that fail
  • Cooling chosen on rack density and climate, not on taste

Electrical

Distribution built for the new density

Legacy halls were built around 5–10 kW racks. AI racks run 40–80 kW and dense liquid designs reach 130 kW, which changes distribution, containment and floor loading entirely.

  • busway
  • 3-phase PDU
  • harmonics
  • step load

Density

40–130 kW

Per-rack draw for current AI systems, against 5–10 kW in legacy halls

Overhead

1.1–1.5

PUE range across modern designs; most of the overhead is heat rejection

Thermal

Where air stops working

Air is practical to roughly 30 kW a rack. Rear-door exchangers take an existing floor to 40–50 kW; direct-to-chip cold plates carry 70–80% of the heat into liquid.

  • RDHx
  • direct-to-chip
  • CDU sizing
  • leak detection

Supply

Grid connection sets the schedule

In constrained markets the connection queue, not construction, is the longest item on the plan. We start the capacity study early and phase energisation so the first racks earn.

  • capacity study
  • queue position
  • PPA
  • BESS

Power

  • Busway distribution
  • Metered 3-phase PDU
  • Modular UPS
  • Gensets
  • Harmonic filters

Cooling

  • Aisle containment
  • Rear-door exchangers
  • Direct-to-chip
  • CDUs
  • Immersion
  • Adiabatic coolers

Generation and storage

  • PV
  • BESS
  • On-site gas
  • Peak shaving

Monitoring

  • DCIM
  • BMS
  • Modbus / BACnet
  • Prometheus
  • Branch metering

Standards

  • Uptime tiers
  • ASHRAE TC 9.9
  • PUE / WUE
  • ISO 50001

Who we do this for

  • Data centre and colocation operators
  • Energy and utility companies
  • Public infrastructure programmes
  • Enterprises retrofitting facilities
  • Investors in AI data centres

Three ways in. Stop after any of them.

2–4 weeks

Power and cooling feasibility

What a site can support: available capacity, rack density ceiling, cooling options, connection lead time and an energy cost model.

Feasibility report with density ceiling, cooling options, energy cost model

12–40 weeks

Design and delivery

Electrical and mechanical design, contractor selection and oversight, grid connection management, commissioning and load testing.

Single-line diagram, thermal design, commissioning results, as-built drawings

Ongoing

Energy operations

Monitoring, PUE and WUE reporting, tariff and demand charge optimisation, and capacity planning against the compute roadmap.

PUE and WUE reporting, tariff review, capacity plan

Questions

Sometimes, at reduced density. A hall built for 6–10 kW racks can often reach 15–20 kW with containment work, and 40–50 kW with rear-door heat exchangers if the chilled water plant and floor loading allow. Beyond that you are rebuilding, and a purpose-built or colocated site is usually cheaper and always faster.

If you need fewer than about four dense racks, or your compute plan will not be stable for two years, do not build. Colocation with a provider that already supports liquid cooling gets you running in a fraction of the time with none of the connection queue risk, and you can build later with real load data.

Direct-to-chip for almost everyone. It is supported by mainstream OEM platforms, retrofits into a conventional hall, and removes 70–80% of the heat to liquid. Immersion earns its place where density is extreme or the environment is dusty, but it narrows your hardware options and changes how the kit is serviced.